Project Controls Services

Project controls for data center construction.

TEOPM specialists run project controls beside your project management team on data center construction: baseline, schedule and earned value reporting, electrical and power distribution progress, equipment move-in, materials, crane coordination and commissioning. We are based in Surprise, Arizona, in the Phoenix metro area.

  • Third-party team since 2014
  • Surprise, Arizona
  • Veteran-owned
Our project controls
Data hall with rows of server racks under a steel truss ceiling

Where to start

Three controls a trade can say yes to.

You do not have to take the full catalog. Start with the control that is costing the program the most days, and add the rest as the project calls for it.

  1. 01

    Crane and Lift Coordination

    Lift requests, approvals and crane availability on one calendar, with conflicts flagged before the day of the lift instead of at the gate.

  2. 02

    Material and Long-Lead Delivery Control

    Switchgear, generators and process equipment tracked from purchase order to gate, so no crew stands waiting on a crate nobody chased.

  3. 03

    Quality and Commissioning Coordination

    Inspection requests, test packs and turnover documentation sequenced so each system is accepted the week it finishes, not a month later.

What our project controls cover on a data center.

Construction project controls connect budget, schedule, progress, and risk into one view of performance across the campus. TEOPM combines technology and construction expertise to help teams identify potential delays, anticipate cost overruns, and make informed decisions from the first data hall to energization.

10 services

Program Command Center

Every fab, data hall and contractor in one rollup: milestone status, critical path and the decisions each one is waiting on.

Schedule & EVM

Schedule and Earned Value Reporting

Percent complete, SPI and CPI measured against the baseline and published on a reporting calendar your executives can plan around.

Heavy Equipment

Equipment Move-In and Rigging Control

Tanks, skids, chillers and switchgear sequenced from the laydown yard to final set, with every rigging window cleared in advance.

Electrical

Electrical and Power Distribution Progress

Progress measured by building, data hall, lineup and termination, so energization dates rest on quantities instead of opinions.

QA/QC & Cx

Quality and Commissioning Coordination

Inspection requests, test packs and turnover documentation sequenced so each system is accepted the week it finishes, not a month later.

Workforce

Workforce and Contractor Reporting

Headcount by contractor, trade, shift and work area, read against the manpower curve the schedule assumed.

Long-Lead Items

Material and Long-Lead Delivery Control

Switchgear, generators and process equipment tracked from purchase order to gate, so no crew stands waiting on a crate nobody chased.

Daily Report

Daily Report from the Field

Each foreman files the day from a phone, with headcount, work in progress, constraints and photos attached, so the report arrives the same afternoon instead of days later.

Crane Calendar

Crane and Lift Coordination

Lift requests, approvals and crane availability on one calendar, with conflicts flagged before the day of the lift instead of at the gate.

Lookahead

Constraint and Lookahead Control

A six-week lookahead with every constraint logged, owned and cleared before a crew is standing in front of it.

Experience behind the controls.

We run project controls today on one of the largest advanced semiconductor programs in the United States, and Matt Barlow, PMP, has led construction, QAQC/commissioning and site logistics teams on a major data center.

Meet the project controls team
  • Matt Barlow, PMP

    Matt Barlow, PMP

    SME

    Electrical QAQC, Commissioning & Site Logistics

    • PMP
    • Master electrician
    • Electrical contractor
    • Spanish · professional
    • US Army veteran
    • PMP-certified project manager with Master Electrician and licensed Electrical Contractor authority. 15+ years leading construction, QAQC/commissioning and site logistics teams on semiconductor facilities and data centers.
    • Construction, QAQC/commissioning and site logistics teams on both major Phoenix semiconductor facilities and a major data center, directly on the project or building the teams that support it.

Common questions.

What is project controls on a data center project?

Project controls connect budget, schedule, progress and risk into one view of performance across the whole campus, so late equipment, open constraints and slipping commissioning dates show up while there is still time to act.

What does TEOPM do on data center projects?

TEOPM runs project controls as a third-party team beside your project management team. That covers baseline, schedule and earned value reporting, electrical and power distribution progress, equipment move-in and rigging, material and long-lead delivery control, crane and lift coordination, and quality and commissioning coordination.

How does TEOPM coordinate crane lifts on a data center site?

Lift requests, approvals and crane availability go on one calendar, so conflicts are flagged before the day of the lift instead of at the gate. The calendar is the Crane Calendar that TEOPM builds and uses on site.

How are long-lead equipment deliveries tracked?

Switchgear, generators and process equipment are tracked from purchase order to gate, so no crew stands waiting on a crate nobody chased. It is part of the material and long-lead delivery control that TEOPM runs for the project team.

What does commissioning coordination cover?

Inspection requests, test packs and turnover documentation are sequenced so each system is accepted the week it finishes, not a month later. TEOPM runs it as quality and commissioning coordination beside the project management team.

How is electrical and power distribution progress measured?

Progress is measured by building, data hall, lineup and termination, so energization dates rest on quantities instead of opinions.

Can a trade start with a single control?

Yes. The full catalog is not required. A trade can start with the control that is costing the program the most days, such as crane and lift coordination, material delivery control or quality and commissioning coordination, and add the rest as the project calls for it.

Where is TEOPM based?

TEOPM is veteran-owned and based in Surprise, Arizona, in the Phoenix metro area. It has run projects for other people’s operations since 2014.

Does TEOPM also work on semiconductor fabs?

Yes. TEOPM also provides project controls for semiconductor fab construction, with its own page and catalog of services. See project controls for semiconductor fabs

Does TEOPM sell software?

What you hire here is the TEOPM project controls team. The field tools it uses on site, such as Daily Report and Crane Calendar, are built by TEOPM and described on Our Solutions. See Our Solutions

Bring project controls to your data center project.

Tell us where the program stands and we will tell you what the numbers need to say.

See Our Solutions