Program Command Center
Every fab, data hall and contractor in one rollup: milestone status, critical path and the decisions each one is waiting on.
Project Controls Services
TEOPM specialists run project controls beside your project management team: baseline, schedule and earned value reporting, tool install and hook-up control, commissioning coordination and safety reporting. We are based in Surprise, Arizona, in the Phoenix metro area.
Construction Project Controls connect budget, schedule, progress, and risk into one clear view of project performance. TEOPM combines technology and construction expertise to help teams identify potential delays, anticipate cost overruns, and make informed decisions.
Every fab, data hall and contractor in one rollup: milestone status, critical path and the decisions each one is waiting on.
Progress measured by building, data hall, lineup and termination, so energization dates rest on quantities instead of opinions.
Chilled water, process piping and mechanical scope earned line number by line number, reported the same week it is installed.
Each process tool followed from fab-in through hook-up, utility connection and qualification, against the move-in window it was promised.
Tanks, skids, chillers and switchgear sequenced from the laydown yard to final set, with every rigging window cleared in advance.
Inspection requests, test packs and turnover documentation sequenced so each system is accepted the week it finishes, not a month later.
Each foreman files the day from a phone, with headcount, work in progress, constraints and photos attached, so the report arrives the same afternoon instead of days later.
Lift requests, approvals and crane availability on one calendar, with conflicts flagged before the day of the lift instead of at the gate.
Our bilingual coordinators carry the same scope, sequence and deadline into each contractor team in its own language.
Headcount by contractor, trade, shift and work area, read against the manpower curve the schedule assumed.
A six-week lookahead with every constraint logged, owned and cleared before a crew is standing in front of it.
Percent complete, SPI and CPI measured against the baseline and published on a reporting calendar your executives can plan around.
Toolbox talks, attendance and permit follow-ups logged from the floor, including construction running next to production.
Gowning, PPE and cleanroom consumables controlled by location and stock level, replenished before a crew is turned away at the airlock.
Switchgear, generators and process equipment tracked from purchase order to gate, so no crew stands waiting on a crate nobody chased.
Semiconductor fabs
Each process tool followed from fab-in through hook-up, utility connection and qualification, against the move-in window it was promised.
Why the data matters as much as the work: When a Semiconductor Project Starts Moving Faster Than Its Data.
We run that function today on TSMC Fab 21, one of the largest advanced semiconductor programs in the United States — whether as full ownership of a capital program or a targeted team at any stage of a single project.
Senior Solutions Consultant
SME
Project controls connect budget, schedule, progress and risk into one clear view of project performance, so delays and cost overruns show up while there is still time to act.
TEOPM runs project controls as a third-party team beside your project management team. That covers baseline, schedule and earned value reporting, progress and cost control, tool install and hook-up control, quality and commissioning coordination, and safety reporting.
TEOPM is veteran-owned and based in Surprise, Arizona, in the Phoenix metro area. Since 2014 it has run projects for other people’s operations.
What you hire here is the TEOPM project controls team. The field tools it uses on site, such as Daily Report and Crane Calendar, are built by TEOPM and described on Our Solutions. See Our Solutions
Tell us where the program stands and we will tell you what the numbers need to say.